Woven wire mesh delivery requirements

Woven wire mesh delivery requirements

When ordering woven wire mesh, there are several factors that can affect the delivery requirements, including stock availability, and the amount of fabrication needed. Here’s a summary of what you can expect:

Stock availability: If a specific mesh specification is in stock, a one to two-day lead time can be expected. However, if the material is not in stock or not supplied by the manufacturer, lead times may increase up to two weeks.

Fabrication requirements: Orders of woven wire pieces that must be cut to specific specifications require more fabrication and have a standard lead time of five days. If the order consists of a high volume of mesh pieces and the material is in stock, the lead time will be customized based on the quantity of pieces.

Sourcing material: If the material is not in stock and the order requires mesh to be cut to a specific specification, the material will be sourced from a supplier. The mesh supplier will provide a lead time for the material to reach the facility, and an additional week will be added to this lead time to calculate a lead time for you.

Keep in mind that shipping times will also depend on the shipping method and destination. It’s essential to communicate with the Ourun Wire Mesh to ensure you have accurate delivery expectations and to manage any special delivery requirements.

 

filtercc

wire screen (wire mesh ,wire cloth )the biggest of world manufacture,application for shielding, water, filter and coal industry

Comments are closed.